Updated July 7 with more photos.
Windows are installed. Dry wall is installed, mudded, and sanded. The electrical wiring passed rough inspection. We enjoyed good progress in spite of a second day of high temperatures. The side deck is finished and the front deck is well under way.
Today was a shorter work day. We planned an early breakdown so that we could have a hot dog supper and fellowship at a church in Williamsburg kind enough to host us. A thunderstorm encouraged us to leave quickly around 4:00.
After the supper, Jordan Cohen instructed all those gathered in the finer points of line dancing. A rather wide distribution of dancing abilities were in evidence.
Please check back for daily updates, and please view the galleries of photos below to follow progress on the site (and fun at the supper).